The project involved a full assessment of the plant’s electrical systems, identifying areas of risk, inefficiency and non-compliance. Our team developed a tailored solution including switchboard replacement, motor control centre upgrades and PLC integration. The upgrades not only enhanced operational continuity but also improved energy efficiency, safety compliance and production monitoring capabilities.
We partner with asset owners, operators and contractors across Australia to deliver compliant, efficient and future ready electrical, mechanical and automation solutions tailored to sector specific operational realities.
Switchboards and motor control centres were near end of service life, causing reliability issues.
Unplanned stoppages disrupted operations and reduced overall plant efficiency and output levels.
Outdated electrical systems posed hazards to personnel and created challenges for regulatory compliance.
Absence of integrated controls restricted performance monitoring and prevented proactive issue identification.

Detailed site review, load evaluation and compliance assessment to define project requirements.

Development of drawings, schedules and technical documentation to ensure safe and efficient execution.

Execution of all electrical works with minimal operational disruption and strict safety compliance.

Verification of performance, compliance checks and system validation before handover.

Optional structured maintenance programs to protect long term asset performance.



Rival Solutions delivered a comprehensive electrical and automation upgrade that enhanced production efficiency, improved safety, and ensured compliance with Australian standards. Each solution was designed to address the facility’s specific operational challenges.
Reduction in unplanned downtime
Better production visibility
Compliance with standards
Energy savings

Operations Manager, BlueTech Manufacturing